Hello! I’m so excited to be the newest contributor here on Remodelaholic! My name is Colleen and I’m the DIY and lifestyle blogger behind Lemon Thistle– home to DIY, home decor, parties and babies. Before I share my bathroom renovation, let’s get to know each other, shall we? I’m a mama to 18 month old twins, I love to party, and my awesome hubby and I are working our way through renovations on our new home. Oh, and we’re operating on a budget too. Nice to meet you! Designer bathrooms offer you competitive bathroom prices on luxury products, from bathroom mirrors to heated towel rails and walk in baths. If you want to change the part of your bathroom that made up of plastic, I can suggest a glass replacement company for you.
It’s officially been one year since we bought our home- a completely original 60’s split level that needed a lot of work (you can see all the before photos here). We’ve been renovating since we got the keys and have another couple years to go. Years!? Yep, we’re working on a budget, so we’re doing everything ourselves. We so enjoy seeing what a bit of elbow grease and paint can accomplish- the transformation is already thrilling. Since we’re working on a budget (I’m sure you can relate!), we had to prioritize our renovations. Our kitchen wasn’t useable, we needed to upgrade all the un-fun stuff (plumbing, electrics, windows etc.), we needed an income suite from the basement, and we really wanted to refinish the floors before we moved in (because who want’s to live through that!?). That meant that our ugly but completely functional bathroom would have to wait. We had it on the schedule for NEXT summer.
But the joys of home ownership means that the one room in the house you thought could wait… can’t. Since we moved in and started using our bathtub it’s been leaking, friends. Not just little leaks, but BIG awful leaks. We had plumbers in to fix it- then another leak would start. This went on for months (and about 5 fixes) until we were out of options. It was leaking into our basement suite, our wall was rotting from all the water, the tile surround was cracked and we couldn’t figure out where the leaks were coming from. We had to reconsider our waiting. I should mention that we only have one bathroom in our house (other than our suite), so not using the tub wasn’t an option. Enter renovating in phases.
Do you remember Young House Love? I loved reading their blog, and they were advocates for renovating in phases. I had always been of the mindset- fix it once and don’t waste your money covering the ugly. But we totally couldn’t afford to do the whole bathroom the way we wanted right now. We could have done a ‘meh’ renovation on the whole room… or we could renovate in phases. We chose the latter and I’m SO happy we did! We knew the bathtub had to go. Our flooring was peeling back and we were pretty sure the subfloor had bad water damage too- so that had to go as well, although we couldn’t afford to lay the tile we want in there permanently. There was really nothing wrong with the vanity or toilet- so we decided those would have to wait.
This post may contains some affiliate links. Please see our full privacy policy and disclosure here.
Here’s what we did for ‘Phase 1’ of our renovation:
- Painted EVERYTHING to get rid of that awful pink
- New shaker door and textured window (along with all the other doors and windows in the house)
- New farmhouse trim and baseboards (along with all in the house)
- New toilet seat (it was broken)
- New Towel Rack (I made this one out of pallet wood! You can check out the DIY here)
- New Tub, surrounding drywall, tile surround, and trim (faucet/ shower)
- New shower curtain (Another DIY I’ll be sharing on my blog tomorrow! It’s extra-tall and wonderful)
- Added a fan for humidity
- Temporary flooring
- Temporary light fixture
- New hardware for the vanity
Whew… it was a lot, right!? The basics- paint, door, window, and all trim were completed for the whole house before we moved in. We also added a bathroom fan and switched out the light fixture before we moved in. The light fixture when we purchased the house was not only broken, but so close to the wall that it had burnt a hole in the drywall! The light fixture we put in is a freebie from my Dad’s bathroom renovation (score!). We plan to get a new one when we finish the remodel (and the one I have my eye on is a beauty!). We also replaced the dated hardware on the vanity with affordable hardware from Target. The chunky plates for the hardware allowed for a quick switch without patching holes in the vanity. These changes were done before our bathtub woes and made a huge difference on their own! The pink being gone was the best part (who paints a ceiling pink!?). I guess this part was technically ‘Phase 1’ but we’ll call it ‘Phase 1A’ and bend the rules.
When our bathtub came out, so did all the plumbing within reach. Our plumber couldn’t even pin point one specific leak because everything was leaking a bit. We bought a builder grade tub from the plumbing supply store and chose to tile the surround. We used the same flooring as in our kitchen renovation to tile the majority of the shower (San Marco Viva Linen). We’d originally bought enough to tile the bathroom floor and our entryway and were storing it in our basement. Using this up means we’ll need to figure out something else for the floors when we get there, but saves some coin in the mean time. The marble hexagon accent tile is the same tile we used for backsplash in our kitchen (from Home Depot), so we were able to use cut pieces and extra from that to help cut cost as well. I tiled the shower myself, I learned on our basement suite shower a couple months ago and am so thrilled with how it turned out! (Grout colour is Delorian Grey) I feel like I can tile anything now. The faucets are Moen (Eva and Iso-we love their lifetime warranty!). Click here to meet our bathroom renovators.